Leakage test of T-14 Cross-Flow Turbine at 3.5 bar (working pressure 2.8 bar)

A project for Sokoine University of Agriculture, Morogoro, Tanzania
     
 
 

Pre load test runner bearing at 1470 RPM (working speed 610 RPM)

MHP Kindimba 40 kW paid by JICA (Ref. Dr. Manabu Tsunoda)
     
 
 

Supply includes tools for easy instalation, operation, and maintenance

Supply includes spare parts for continuity of the project
     
 
 

A tested T-14 Cross-Flow Turbine is ready for shipment to Tanzania, East Afrika

Rice milling in Kindimba Tanzania, powered by turbine from Indonesia
 