1992-1994 1994-1995 1995-1997 1997-1998 1998-1999 1999-2000 2001(Tanzania/Serawak) 2002 |
||
![]() |
![]() |
|
|
Leakage test of T-14 Cross-Flow Turbine at 3.5 bar (working pressure 2.8 bar) |
A project for Sokoine University of Agriculture, Morogoro, Tanzania | |
![]() |
![]() |
|
|
Pre load test runner bearing at 1470 RPM (working speed 610 RPM) |
MHP Kindimba 40 kW paid by JICA (Ref. Dr. Manabu Tsunoda) | |
![]() |
![]() |
|
|
Supply includes tools for easy instalation, operation, and maintenance |
Supply includes spare parts for continuity of the project | |
![]() |
![]() |
|
|
A tested T-14 Cross-Flow Turbine is ready for shipment to Tanzania, East Afrika |
Rice milling in Kindimba Tanzania, powered by turbine from Indonesia | |