1992-1994 1994-1995 1995-1997 1997-1998 1998-1999 1999-2000 2001(Tanzania/Serawak) 2002

 
 

ELC and Generator test for MHP Long Lawen Serawak-Malaysia

ELC and Switch Gear, a working test before sent to Serawak-Malaysia
     
 
 

ELC (Electronic Load Controller ) with capacity of 10 kW , 1 Phasa, 240 V, 50 Hz

Runner Balancing before turbine of MHP Long Lawen assembly
     
 
 

MHP Long Lawen, a project for Dayak community Kenyah Uma Badeng

Long Lawen, located in area of Tekulang river, Belaga, Serawak, Malaysia
     
 
 

A cooperation of Uma Badeng, Borneo Project (USA) with Green Empowerment (USA)

Flour milling mechanically coupled to turbine for increasing productivity
 
Home Click to jump to the Photo Gallery