1992-1994 1994-1995 1995-1997 1997-1998 1998-1999 1999-2000 2001(Tanzania/Serawak) 2002 |
||
![]() |
![]() |
|
|
ELC and Generator test for MHP Long Lawen Serawak-Malaysia |
ELC and Switch Gear, a working test before sent to Serawak-Malaysia | |
![]() |
![]() |
|
|
ELC (Electronic Load Controller ) with capacity of 10 kW , 1 Phasa, 240 V, 50 Hz |
Runner Balancing before turbine of MHP Long Lawen assembly | |
![]() |
![]() |
|
|
MHP Long Lawen, a project for Dayak community Kenyah Uma Badeng |
Long Lawen, located in area of Tekulang river, Belaga, Serawak, Malaysia | |
![]() |
![]() |
|
|
A cooperation of Uma Badeng, Borneo Project (USA) with Green Empowerment (USA) |
Flour milling mechanically coupled to turbine for increasing productivity | |
| Any problems? Contact Webmaster |
PT.Heksa Prakarsa Teknik-Small Hydro Power Engineering
Copyright © PT.Heksa Prakarsa Teknik, 2002 Last updated Friday 14 March, 2003 |